It must be installed in the load level on the flat water with resistance over 1000 kilograms per square meter. Ideally, it should be installed in a horizontal plane, however, it may determine the location of the equipment under the therapy trainers (up to 3 meters). In order to reduce the difficulty of installation, if allowed, equipment should be installed in an upstairs. When installing equipment, must ensure that the trainer has no block and level to enter, if equipment is installed in the underground lower or upstairs, then must use the elevator to transport the trainer.
We recommend a good trainer should be installed around the drainage system on the ground. Training room, the minimum should be 2.5 meters high. Install door for minimal size should be 1 m wide, 2.2 meters high. When unloading container needs a minimum capacity of 5 tons of forklift and extension fork.
|