PRODUCTS
Products view

Welcome vist Dalian Haohai’s website
Walking sinklocation:home > Product introduction > Walking sink

Walking sink

Role: rehabilitation training

Descriptions:

- heating device: 4.5 kw, with a flow switch

- storage capacity: 1700 liters

- sand filter or cartridge filter

Chemical dosing system

- resistance: on/off

Treadmill exercise, speed adjustable, 0.75 kw, 24 v dc, IP68

- water (optional preset level) : 300600900120 mm.

 

- water temperature: flow of 35 degrees Celsius.

 

- storage capacity: 1700 liters.
- full or empty time: 3 minutes
- adjustable treadmill speed: 0.1-8 km/hour. 0.75 kw, 24 V DC, IP68
- trademill size: 1200 * 500 mm.
- control panel located in the sink.
- through security sink can observe the patient's condition.
- for wheelchair by platform with slope.
- water treament sytem and reservoir can be located in  different rooms, at the same level or under the same ground of  therapy bath.

Servo requirements:
Power supply: 220 or 230 v, 1 phase, 30 Amps.
The equipment must be connected  with insulators of power distribution cabinent together. 
 
-The cold water can be supplied to a reservoir indirectly being filling and accumulation by rubber hoses.
-Drainage pipe with a diameter of 100 mm is the channel of the device in the wastewater.
-Pipe of 100 mm diameter on the ground in the area of movement is used to prevent water overflow.

 

Installation requirements

 

It must be installed in the load level on the flat water with resistance over 1000 kilograms per square meter. Ideally, it should be installed in a horizontal plane, however, it may determine the location of the equipment under the therapy trainers (up to 3 meters). In order to reduce the difficulty of installation, if allowed, equipment should be installed in an upstairs. When installing equipment, must ensure that the trainer has no block and level to enter, if equipment is installed in the underground lower or upstairs, then must use the elevator to transport the trainer.
We recommend a good trainer should be installed around the drainage system on the ground. Training room, the minimum should be 2.5 meters high. Install door for minimal size should be 1 m wide, 2.2 meters high. When unloading container needs a minimum capacity of 5 tons of forklift and extension fork.

Axonometric projection